Estimating & takeoff
Taylor takes the full bid package — drawings, specs, addenda, wage schedules, bid forms. She performs takeoffs, flags conflicts between sheets and specs, and prices labour, material and sub lines. Every line traces to a sheet or a spec section; missing information reads UNKNOWN, with the reason and who has it.
| Line item | Qty | Unit | Source | Basis |
|---|---|---|---|---|
| Branch wiring · floors 2–4 | 38,400 | LF | E-402–E-405 | Wage sched. line 16 × takeoff; waste 5% |
| Light fixtures Unknown | — | EA | Fixture schedule | Not in the set — request from architect |